人人狠狠综合久久亚洲婷婷-人人九九-人人九九精-人人九九精品-人人看操-人人看人莫人人爱免费看

Hotline
+86 15993886110
林州鳳寶高能材料科技有限公司
林州鳳寶高能材料科技有限公司
林州鳳寶高能材料科技有限公司
News Your current location:Home > News
Correct construction sequence of cathode carbon block, refractory brick and refractory castable for aluminium reduction cell

Aluminum electrolysis cell is the main thermal equipment in aluminium electrolysis production. There are many electrolytic cells in the aluminium electrolysis workshop. The construction of furnace construction is often carried out in parallel or cross with other professional projects. In order to gain time to speed up the progress of the project and to centralize and timely supply of various materials and energy, several electrolyzers are usually constructed at the same time. Each electrolyzer has many construction processes, and the links between them are close. Construction and preparation of carbon materials need to ensure a certain humidity, but also consume a large amount of compressed air and electricity. Therefore, the preparation work of material transportation, compressed air and electricity supply should be done well before construction.


Construction of Aluminum Electrolytic Cell

The construction of electrolyzer should start from one end of the workshop and organize the flow-line operation according to the construction process of each electrolyzer. Before lining the electrolyzer, the production of cathode carbon block group should be carried out in advance. The construction of electrolyzer and the production of cathode carbon block are carried out according to the following procedures, as shown in Fig. 1 - 3.



Before the construction of the electrolyzer, the cathode carbon blocks and coarse seam paste are transported by car from the carbon material warehouse to the assembly yard of the electrolyzer overhaul workshop, then unloaded by forklift truck to the assembly platform and heated in the kneading pot. At the same time, after rust removal, the heated cathode steel rod is hoisted to the assembly platform by a bridge crane. The qualified cathode carbon block group is repaired and inspected. It is transported to the electrolysis cell of the electrolysis workshop by automobile. It is installed by bridge crane and hoisting frame. Clay refractory bricks, heat insulation products and side carbon block are transported to the open space of the electrolysis workshop by automobile, and then stacked on the operating platform near each electrolysis cell by bridge crane. The heated rough seam paste is put into the paste box and pulled to the electrolysis workshop by car for reserve.

Before tamping, the vertical seam between the bottom carbon block group and the seam between the carbon block group and the side carbon block can be put into the seam by 4-5kW tubular or chip heater to heat it to the required temperature. If the local temperature is not enough after heating, the light oil heater can be used for local heating.

After the anode carbon block group is manufactured in the anode assembly workshop, it is transported to the electrolysis workshop by an anode tray truck and installed by a multi-energy bridge crane. Other auxiliary materials and powder can be transported by trolley.


豫公網(wǎng)安備41058102000350號

Message
Contact
Scan

Scan

Top
免费做爰猛烈吃奶摸视频在线观看 | 国产精品亚洲精品久久精品 | 无码人妻一区二区三区一 | 男女啪啪永久免费观看网站 | 粉嫩av久久一区二区三区 | 免费观看a级毛片 | 色翁荡熄又大又硬又粗又动态图 | 狠狠噜天天噜日日噜视频麻豆 | 2015日韩永久免费视频播放 | 少妇av射精精品蜜桃专区 | 欧美男男大粗吊1069 | 国产一区二区三区美女 | 国产精品永久久久久久久久久 | 三级特黄60分钟在线观看 | 老司机一级毛片 | 国产精品∧v在线观看 | 国产激情艳情在线看视频 | 国产欧美亚洲精品 | 亚洲国产精久久久久久久 | 熟妇高潮精品一区二区三区 | 久久国产免费一区二区三区 | 丰满多毛少妇做爰视频 | 97久久精品无码一区二区天美 | 96免费精品视频在线观看 | 久久免费99精品久久久久久 | 国产亚洲一区二区三区在线 | 色综合av综合无码综合网站 | 国产精品女人呻吟在线观看 | 性一交一乱一伦一 | 囯产精品一区二区三区线 | 自拍偷自拍亚洲精品被多人伦好爽 | 精品一区二区三区免费播放 | 中文字幕亚洲综合久久 | 粗大的内捧猛烈进出小视频 | 中文在线а√天堂官网 | 色婷婷亚洲一区二区三区 | 98pao强力打造高清免费 | 国内精品久久久久影院优 | 18黄网站 | 国产亚洲精品久久久闺蜜 | 国产一区二区三区成人欧美日韩在线观看 |