人人狠狠综合久久亚洲婷婷-人人九九-人人九九精-人人九九精品-人人看操-人人看人莫人人爱免费看

Hotline
+86 15993886110
林州鳳寶高能材料科技有限公司
林州鳳寶高能材料科技有限公司
林州鳳寶高能材料科技有限公司
News Your current location:Home > News
Correct construction sequence of cathode carbon block, refractory brick and refractory castable for aluminium reduction cell

Aluminum electrolysis cell is the main thermal equipment in aluminium electrolysis production. There are many electrolytic cells in the aluminium electrolysis workshop. The construction of furnace construction is often carried out in parallel or cross with other professional projects. In order to gain time to speed up the progress of the project and to centralize and timely supply of various materials and energy, several electrolyzers are usually constructed at the same time. Each electrolyzer has many construction processes, and the links between them are close. Construction and preparation of carbon materials need to ensure a certain humidity, but also consume a large amount of compressed air and electricity. Therefore, the preparation work of material transportation, compressed air and electricity supply should be done well before construction.


Construction of Aluminum Electrolytic Cell

The construction of electrolyzer should start from one end of the workshop and organize the flow-line operation according to the construction process of each electrolyzer. Before lining the electrolyzer, the production of cathode carbon block group should be carried out in advance. The construction of electrolyzer and the production of cathode carbon block are carried out according to the following procedures, as shown in Fig. 1 - 3.



Before the construction of the electrolyzer, the cathode carbon blocks and coarse seam paste are transported by car from the carbon material warehouse to the assembly yard of the electrolyzer overhaul workshop, then unloaded by forklift truck to the assembly platform and heated in the kneading pot. At the same time, after rust removal, the heated cathode steel rod is hoisted to the assembly platform by a bridge crane. The qualified cathode carbon block group is repaired and inspected. It is transported to the electrolysis cell of the electrolysis workshop by automobile. It is installed by bridge crane and hoisting frame. Clay refractory bricks, heat insulation products and side carbon block are transported to the open space of the electrolysis workshop by automobile, and then stacked on the operating platform near each electrolysis cell by bridge crane. The heated rough seam paste is put into the paste box and pulled to the electrolysis workshop by car for reserve.

Before tamping, the vertical seam between the bottom carbon block group and the seam between the carbon block group and the side carbon block can be put into the seam by 4-5kW tubular or chip heater to heat it to the required temperature. If the local temperature is not enough after heating, the light oil heater can be used for local heating.

After the anode carbon block group is manufactured in the anode assembly workshop, it is transported to the electrolysis workshop by an anode tray truck and installed by a multi-energy bridge crane. Other auxiliary materials and powder can be transported by trolley.


豫公網(wǎng)安備41058102000350號

Message
Contact
Scan

Scan

Top
久久久久久a亚洲欧洲av冫 | 亚洲中文字幕无码中文字 | 精品久久久久久中文字幕人妻最新 | 久久亚洲精品无码va白人极品 | 无码人妻精品一区二区三区夜夜嗨 | a级黄色片免费 | 91av短视频| 成年免费a级毛片免费看无码 | 性裸交a片一区二区三区 | 日韩一区二区三区射精 | 俄罗斯午夜影院 | 宅男66lu国产在线观看 | 欧美人与物videos另类 | 欧洲熟妇色 欧美 | 欧美大片va欧美在线播放 | 久久全国免费久久青青小草 | 97国产成人精品免费视频 | 艳妇乳肉豪妇荡乳av无码福利 | 精品国产成人三级在线观看 | 无遮掩60分钟从头啪到尾 | 亚洲色欲久久久综合网 | 国产一区二区三区久久精品 | 亚洲日韩精品国产一区二区三区 | 国内老熟妇对白xxxxhd | 无码国模国产在线观看 | 美女扒开屁股让男人桶 | 成人男女做爰高清免费网站 | a级国产乱理伦片在线观看 国产特黄级aaaaa片免 | 国产精品国产三级国产普通话对白 | 夫妻免费无码v看片 | 国产黄大片在线观看画质优化 | 中文字幕无线码免费人妻 | 成人性生交大片免费看中文 | 国产精品爱久久久久久久电影蜜臀 | 日本中国内射bbxx | 玩弄人妻少妇精品视频 | 亚洲国产精品无码专区在线观看 | 黄网站在线播放视频免费观看 | 精品国产乱码久久久久久免费 | 中国大陆高清aⅴ毛片 | 欧美性生交xxxxx久久久 |